fbpx

Penang Hill cable car project breaks ground

penang-hill-1

In a landmark event heralding a new chapter for Penang’s iconic landscape, the groundbreaking ceremony for the Penang Hill Cable Car project was recently held at the Penang Botanic Gardens. The ceremony, officiated by Prime Minister Datuk Seri Anwar Ibrahim, marks the culmination of meticulous planning and signals the beginning of physical construction for this eagerly awaited project.

Chief Minister Chow Kon Yeow, in his address, described the occasion as historic for Penang, emphasizing the project’s role in enhancing connectivity and accessibility to Penang Hill. With its 2.73-kilometer route spanning from the Penang Botanic Gardens to the summit of Penang Hill, the cable car promises not only to ease transportation but also to elevate Penang Hill as a premier tourist attraction.

Scheduled for completion in the third quarter of 2026, the cable car system will feature 50 eight-seater gondolas, ensuring a quick and scenic ride of less than 10 minutes. This development aligns with sustainable practices, committed to achieving Green Building Index (GBI) Gold certification, highlighting Penang’s dedication to environmental stewardship.

The project, spearheaded by the Penang Hill Corporation (PHC) and awarded through a Public-Private Partnership (PPP) to Hartasuma Sdn Bhd, represents a strategic investment in Penang’s tourism infrastructure. Hartasuma’s commitment to eco-friendly construction methods and energy-efficient technologies underscores their pledge to minimize environmental impact while maximizing visitor experience.

Prime Minister Anwar Ibrahim praised the collaborative efforts of all stakeholders involved and emphasized the project’s importance in fostering sustainable tourism. He stressed the significance of preserving Penang’s rich biodiversity and cultural heritage, urging rigorous environmental monitoring throughout the construction phase.

Moreover, the integration of an electric feeder bus service linking the Botanic Gardens station with the Air Itam funicular station promises seamless connectivity for visitors. This cohesive transit loop not only enhances accessibility but also supports local communities and economic growth.

As Penang prepares to embark on other transformative projects like the Penang International Airport expansion and the LRT system, these initiatives underscore Penang’s ambition to emerge as a leading global destination, blending cultural vibrancy with sustainable development.

SITE PROGRESS: Sanctuary Suria (Jun 2024)

Property News/ 28 June 2024 No comments

sanctuary-surai-site-progress-jun2024-2

About Sactuary Suria

The 6th phase of residential development at Permatang Sanctuary by IJM in Alma, Bukit Mertajam. Located along Lorong Santuari 25 & 27, adjacent to Sanctuary Court. It is only a short drive to an abundance of amenities namely AEON Mall, Tesco Hypermarket, eateries, schools and banks. This development features 20 units of 2-storey semi-detached houses, with two different built-up sizes to choose from.

Find out more about Sanctuary Suria

Register your interest here and we will keep you updated.

(This information will be used to keep you updated on the project and future development.)
*By submitting this Form, you hereby agree to our PDPA Consent Clause.

Major water supply projects to meet rising demand

Property News/ 28 June 2024 No comments

pba-project

The Penang Water Supply Corporation (PBAPP) is undertaking four major water supply engineering projects this year to address Penang’s increasing water demand.

PBAPP’s chief executive officer K. Pathmanathan, stated that the four priority projects are:

  • Package 12A at the Sungai Dua Water Treatment Plant (WTP).
  • A 13km x 1.8m pipeline from Sungai Dua WTP to Butterworth in Seberang Perai.
  • A 3.9km x 1.8m pipeline on Penang island, from the Macallum area to the PBAPP Bukit Dumbar Complex.
  • A 1.35m Sungai Perai River-Crossing pipeline.

“The total projected cost of these four projects is RM220 million.

“Package 12A and the 1.8m pipeline laying projects are part of PBAPP’s Water Contingency Plan 2030 (WCP 2030).

“The Sungai Perai River-Crossing pipeline project is a long-term solution to replace the burst 1.35m underwater pipeline. It will serve as a crucial component of PBAPP’s pipeline network, enabling the transfer of more treated water from Sungai Dua to the southwest district on Penang Island, central Seberang Perai, and south Seberang Perai (SPS) areas,” Pathmanathan said.

He added that PBAPP’s commitment to complete these projects in 2024 demonstrates the corporation’s response to Penang’s growing water demand.

Pathmanathan also highlighted completed projects from 2023 and the first quarter of this year, which include:

  • A new dissolved air flotation (DAF) water treatment module at the Bukit Panchor WTP to increase water supply by 10 MLD in SPS in 2024, the first component of the WCP 2030.
  • Two 0.25 MLD ‘Portable WTPs’ at Taman Sungai Duri Indah to alleviate intermittent water issues in this SPS neighborhood.
  • Installation of suction tanks at the Taman Widuri and Taman Wellesley pumping stations to alleviate intermittent water issues in these SPS neighborhoods.
  • Replacement of two major 1.2m control valves at the Sungai Dua WTP and various ancillary water works projects at 22 other locations throughout Penang to prevent major unscheduled water supply interruptions for 590,000 consumers on Penang Island and in Seberang Perai.
  • Pipeline diversion works to connect two 600mm pipelines at Sungai Perai as a mid-term solution to the burst 1.35m underwater pipeline mishap that affected 120,000 consumers on Penang Island.

“The total expenditure for these projects completed in 2023 and the first quarter of 2024 amounted to RM33.72 million,” Pathmanathan added.

Source: Buletin Mutiara

Tags:

PROPOSED: Bukit Mertajam / CMC Premier Land Sdn. Bhd.

Bukit Mertajam/ 27 June 2024 No comments

proposed-development-cmc-premier-land

A proposed strata development by CMC Premier Land Sdn. Bdh. at the ever-bustling township of Alma in Bukit Mertajam. Strategically located near Jalan Alma Ria 2, this upcoming project is adjacent to Jesselton Hills and in close proximity to the Hillpark Residences gated community. Additionally, it is conveniently situated less than a five-minute drive from the Machang Bubok township.

This development to offer a gated and guarded community, featuring a variety of landed housing options, including:

  • 33 units of 3-storey bungalows
  • 36 units of 2-storey bungalows
  • 18 units of 3-storey semi-detached houses
  • 14 units of 2-storey semi-detached houses

While the project is still awaiting approval, more detailed information will be provided upon its official launch.

Project Name : (to be confirmed)
Location : Alma, Bukit Mertajam
Property Type : Gated and guarded
Tenure: Freehold
Land Area: (to be confirmed)
Built-up Size: (to be confirmed)
Total Units : 69 (bungalow), 32 (semi-detached)
Indicative Price : (to be confirmed)
Developer : CMC Premier Land Sdn. Bhd.

Register your interest here for updates on this project and other property news

(This information will be used to keep you updated on the project and future development.)
*By submitting this Form, you hereby agree to our PDPA Consent Clause.
LOCATION MAP

DISCLAIMER: This article is solely based on research done using publicly available data. This is not an advertisement. Any claim, statistic, quote or other representation about a project or service should be verified with the developer, provider, or party in question.

SITE PROGRESS: Terraces Condominium (Jun 2024)

Property News/ 26 June 2024 No comments

the-terraces-site-progress-jun2024-3

About Terraces Condominium

A highrise residential development by IJM Land at Bukit Jambul, Penang. Strategically located on 9.32 acres of land next to INTI International College. It comprises a 34-storey condominium tower, featuring 410 residential units with two different design types to choose from.

Find out more about Terraces Condominium

Register your interest here and we will keep you updated.

(This information will be used to keep you updated on the project and future development.)
*By submitting this Form, you hereby agree to our PDPA Consent Clause.