The Rise (Chelliah Park City)

George Town/ 12 April 2013 Leave a comment

The Rise (was known as Chelliah Park City), an affordable housing scheme by Penang State Government. Zubicon Sdn Bhd has been awarded the tender to build 1,900 units of affordable housing at Jalan S.P. Chelliah in Georgetown. This housing scheme comprises units with size ranging from 700 sq.ft onwards. Here are the summary of units available for each category:

Category
Size
 Price/unit
Total
Medium Cost
1000 sq.ft.
 RM 400000
80 unit
900 sq.ft.
 RM 300000
165 unit
800 sq.ft.
 RM 200000
885 unit
Low Medium Cost
700 sq.ft.
 RM 72500
770 unit
Total
1900 unit

Zubicon has proposed the concept of sustainable and self-contained compact development which would fit into a central business district, consisting of RM 25 million worth of public facilities that include a linear park, a 70 percent green space and the improvement of Sungai Pinang.

The public facilities include a linear park and beautification of Sungai Pinang, bus terminal, bicycle lane and pedestrian walkway and also a surau.

READ MORE ABOUT AFFORDABLE HOUSING:

For registration details, you may refer to http://erumah.penang.gov.my/

Property Name: The Rise (previously known as Chelliah Park City)
Location :
 Jalan S.P. Chelliah, Georgetown, Penang
Property Type : Mixed development
Built-up Area: 700 sq.ft. – 1,000 sq.ft.
Developer : Zubicon Sdn Bhd

Register your interest here

(This information will be used to keep you updated on the project and future development.)
*By submitting this Form, you hereby agree to our PDPA Consent Clause.

Location Map:


[streetview width=”100%” height=”250px” lat=”5.408722″ lng=”100.32451600000002″ heading=”-1.4609956598576355″ pitch=”-5.456108809134513″ zoom=”0.009999999999999898″][/streetview]

Tags:
RELATED PROPERTIES FOR SALE/RENT AT
  1. Kate
    March 12th, 2015 at 11:34 | #1

    For those who are bothered by leasehold, you can maybe take Spore as a reference, as they have had quite a number of housing projects which the lease have expired.

    Typically what happened in Spore is, if it’s a low dense project, by definition not more than 350 units, developers would normally try to buyut the project en-bloc, so that it can pay the extension/conversion premium to the gov to have the lease extended or converted to freehold, and then demolish the old buildings to rebuild a luxury and high density project. They can make money that way. Of course, this normally happens in prime area. To increase the success rate of en-bloc buyout, developers normally offer very attractive price to owners, something that is more than enough for owners to buy another brand new unit with the same size.

  2. LMF
    March 12th, 2015 at 13:47 | #2

    That is Spore, here is Malaysia, bolehland…different!

  3. Penang
    March 12th, 2015 at 14:08 | #3

    The price will depreciate more with Malays majority.

  4. Penang
    March 12th, 2015 at 14:10 | #4

    One good example will be Mutiara Heights.

  5. elle
    March 13th, 2015 at 18:06 | #5

    I have a question regarding these ‘affordable houses’.

    I do understand that buyers are not allowed to sell these units within 5 years of SNP date.
    After that 5-year period, are there any rules regarding its sale? (for example restriction from selling to high-income buyers, etc, etc like the rules we see on Low Cost houses)

    Thanks

  6. jl
    March 14th, 2015 at 11:21 | #6

    As i know that is ten year period no 5 year period.

  7. Eric
    March 16th, 2015 at 22:46 | #7

    How to apply?Where is developer office?TQ

  8. KC
    March 19th, 2015 at 14:07 | #8

    @Sharon
    Hi Sharon, can I know so far what banker is available for this project ?

  9. Thila
    March 25th, 2015 at 16:25 | #9

    Anyone here called for balloting already?

  10. Nic
    March 30th, 2015 at 10:21 | #10

    Anyone know when to sign S&P and balloting?

  11. Ah Seng
    March 30th, 2015 at 11:06 | #11

    Balloting is today!

  12. yokjeff
    March 30th, 2015 at 20:29 | #12

    chelliah all units sold out alrl,sign S&P and balloting mayb on coming tis Month

  13. LIM
    April 3rd, 2015 at 11:47 | #13

    Hi all,

    Just wondering now we buy the Chelliah Park unit, in future how much the house value would going to up? Eg, the 200K unit.

  14. yumi
    April 3rd, 2015 at 13:02 | #14

    leasehold..
    maybe cant too much..plus too high density..like lowcost flat..my point of view only

  15. Andy
    April 5th, 2015 at 13:33 | #15

    Hi, anyone got the confirmation on the date of S & P signing and balloting? I’ve got the offer for 800 sqft RM 200k unit. Thanks! According to the developer it should be end of April or early May? Anyone else got the latest info as mine one was informed in mid-Mar.

  16. CLARICE
    April 8th, 2015 at 13:06 | #16

    I have got the 3k unit, Andy is right either end April or early May is the signing of S&P and draw unit on the same day according to the staff. If don’t buy this unit with this price or worry about the density , i don’t think we able to get this type of property in Penang with better price and low density anymore.

  17. JOSH
    April 9th, 2015 at 15:27 | #17

    Hello. I was offered the 800 sq ft unit and I am in the midst of securing a home loan. I have just a few question which I hope one or some of you can assist to answer.

    I have spoken with two different staff in Zubicon They have told me that the process (after I get a home loan) would be like this: (all on the same day) give the deposit, sign the S&P, ballot. I understand the need for balloting but I do not understand (and I wonder if it is true) why I am not allowed to REJECT the offer, should I decide to not purchase the house, if I have selected a unit that I am not happy with.

    I accept that I cannot select the unit but is it correct that I cannot reject after the balloting session? So buyers do not have a choice at all after balloting?

    I have called up the Bahagian Perumahan and the person I spoke to said developers have the right to design the methodology that suits them best. How is that fair? There will definitely be developers which will come up with practices that benefit them most. Just because a it comes under the “affordable housing scheme”, it should not mean that buyers be stripped of their buying decision, no?

    Anyway, I would appreciate it if any one of you could clarify on this matter. Thank you in advance.

  18. Daniel Seet
    April 11th, 2015 at 11:34 | #18

    Hi all,

    i’ve submitted the affordable housing form direct to the bahagian perumahan staff at zubicon office on 14th feb 2015 the day of the roadshow. how long or when i can know the result if i got the offer of the house unit?till now i got no reply or answer.

  19. Yeang Mei Chang
    May 5th, 2015 at 16:25 | #19

    Any units available ???? 700/800 sq ft.

  20. Sharon
    May 16th, 2015 at 19:16 | #20

    May i know…. anyone of you signed the bank loan offer letter?

    On February, the developer had rushed us for the loan application…. but now almost three months, i was not called for ballot. and now… the bank rushing me to sign bank loan offer letter even though there is no lot number…. cos the offer will be expired in next week. is any one facing the same problem with me?

  21. jeffyok
    May 21st, 2015 at 01:33 | #21

    last week i have sign 2nd times loan offer letter be4 expired date. for those facing same problem can ask panel banker better.

  22. Sharon
    May 21st, 2015 at 15:29 | #22

    Thanks jeffyok for the info.

  23. Nic
    May 27th, 2015 at 10:02 | #23

    Anyone know when to sign S&P and balloting?
    Or anyone can add me inside the discussion group…what happen to the project?

  24. Genius
    Genius
    May 29th, 2015 at 09:23 | #24

    It’s fine to sign the bank loan offer letter first, any happen u can reject and write letter to bank only, not a big deal. I not sure when they ask to sign S&P and balloting. My friends still waiting.

  25. Mhd
    June 10th, 2015 at 15:50 | #25

    Any units left? I apply but till now no letter from bahagian perumahan. I very worry.

  26. LIM
    June 16th, 2015 at 16:20 | #26

    Everybody is waiting for the balloting and sign S&P. When is the date?? Did anybody go to query the developer?

  27. Deaza
    June 17th, 2015 at 13:55 | #27

    Today i went to Zubicon to discuss about the offer letter I recieved a few weeks ago. It’s LEASEHOLD for sure, confirmed. They have a guy from Maybank waitin’ in there for consulation and loan process. You will need to pay..as usual 10% down payment..you can’t pick the unit you want @__@ imagine you got the “between” block. All you can see is the other side of the building..no view at all ( no balcony too ) for 800sf. The project will be completed around 2018. That’s all i got.

  28. Lol
    June 17th, 2015 at 23:22 | #28

    luckily rejected this project already…woohoo…

  29. fareast
    June 18th, 2015 at 22:17 | #29

    As we all are worried about the balloting also the status of this project, i would come up with a whatsapp/telegram group. Pls pm me ur hp number. Will add u in. To be in this group u must sent photo of your offer letter from zubicon or bank or perumahan. Thank you. 0132463301

  30. imwhoim
    June 26th, 2015 at 20:09 | #30

    cant ballot?

  31. Dan
    July 16th, 2015 at 08:09 | #31

    Hi we just approved by gov for 400k unit,actually we apply for one foresta but approve for sp chelliah ,mayb my ic address is in Georgetown area,izit worth to buy ? Cz heard tat a lot of complain n not much facility like swimming pool n gym room…and the developer any comment?

  32. poor
    July 16th, 2015 at 09:50 | #32

    Dan :
    Hi we just approved by gov for 400k unit,actually we apply for one foresta but approve for sp chelliah ,mayb my ic address is in Georgetown area,izit worth to buy ? Cz heard tat a lot of complain n not much facility like swimming pool n gym room…and the developer any comment?

    ppl pay 200k get 800sf, u pay 400k should get 1600sf but only 1000sf for u, not worth, just reject and apply other

  33. imwhoim
    July 20th, 2015 at 11:37 | #33

    i feel SP chelliah and One Forest very congested as seen.
    like tauhu squeeze among each other.

  34. Guy
    July 22nd, 2015 at 11:14 | #34

    Sp chilliah until now no sign snp all the time dragging. Federal not approve yet apdl licence.already 8 month no sign snp

  35. sandra
    July 22nd, 2015 at 15:22 | #35

    Went to developer office 200sq ft no more ..only left 300 and 400sqft unit. 100 sqft different but paying 100k more..and sharing same facility. Nnot all the 900sqft units are corner lot.

  36. sandra
    July 22nd, 2015 at 15:23 | #36

    800sq ft no more

  37. CHOON
    July 29th, 2015 at 15:46 | #37

    Anybody intend to buy extra car park for RM27,500.00?

    Isn’t it worth to buy???? please comments.

  38. Ah Hui
    July 29th, 2015 at 22:26 | #38

    @CHOON
    Not worth…this project is complicated with high density.. And somemore is leasehold..

  39. jeev
    August 18th, 2015 at 11:12 | #39

    How is the project progress.

  40. simpson
    August 19th, 2015 at 15:53 | #40

    I hear this project is currently pending APDL (developer’s license) approval from the Ministry of Housing under federal government. And because the Minister at MOH is not agreeable with Penang’s CM Lim, MOH is delaying the approval. In other words, the progress of this project is currently a victim of ridiculous politicking.

    That’s last I heard, which was about a week ago. Anyone with more recent news?

  41. Genius
    Genius
    August 20th, 2015 at 14:49 | #41

    no news??

  42. SubMachineGan89
    August 23rd, 2015 at 20:42 | #42

    Every day I pass by the site when on my way to work. Was wondering is the project has been approved by Ministry Of Housing? A bit of progress is on going. Maybe the reason approval is pending due to the high density (Maybe?)?

  43. simpson
    August 26th, 2015 at 11:34 | #43

    @SubMachineGan89

    FYI, developers CAN proceed with construction works without the APDL. The problem with working without APDL is that the developer cannot issue the S&P agreement. Without the S&P, they are unable to sell their units. Unable to sell their units, they have no access to funds. Without funds, they cannot finance construction works. The reason you’re still seeing construction works going on is because this developer probably have some cash reserve. And trust me, if the APDL gets delayed for longer periods, say 3 or 6 more months, this developer will run out of their own cash, and they will have no choice but to stop construction works – EVERYBODY suffers – developer, workers, buyers. And again, all this is down to silly state vs federal govt politicking. Not any other side issues like density or whatever. Just a childish fight. It is embarrassing that this is still happening in this age, 2015. But then again this is Bolehland.

  44. Zen
    September 9th, 2015 at 12:44 | #44

    for any one who got SP Chelliah LMC, now we have created in whatsapp a chelliah LMC group now we already have few people there we hope can more people to join it, so we can share the progress info about this project, pls leave text on my whatsapp 0164711848

    thanks

  45. JM
    September 20th, 2015 at 03:41 | #45

    The latest news i got from zubicon is the further delay the S&P agreement to Nov. They yet to obtain the approval from federal. Sigh….

  46. Genius
    Genius
    September 21st, 2015 at 10:57 | #46

    Yeah APDL didnt get yet, can do earthwork but cant sell and sign snp, I heard is end of Oct only can get…

  47. Jannet
    October 9th, 2015 at 17:00 | #47

    Hopefully can heard good news from Zubicon.
    im waiting long time for signing SPA.
    i want signing ASAP

  48. ray
    October 9th, 2015 at 17:12 | #48

    If gov approved me in tri pinnacle, can anyone know how to switch to The rise?

  49. CHOON
    November 16th, 2015 at 10:55 | #49

    Good news, obtained APDL

  50. JOSH
    November 16th, 2015 at 11:01 | #50

    Hi CHOON, are you sure Zubicon has obtained APDL? Where did you get the news from?

  51. penang_kia
    penang_kia
    November 16th, 2015 at 11:10 | #51

    @ray
    Contact Perumahan/Komtar and tell them you wanna switch. You probably need to write a letter too, but can always call them to check.

  52. Sunny
    November 16th, 2015 at 11:18 | #52

    @JOSH

    It is shown in newspaper recently that the APDL is approved.

  53. LIM
    November 17th, 2015 at 11:52 | #53

    YES, THE APDL ALREADY APPROVED. CHECKED WITH KOMTAR PERUMAHAN. NOW WAITING THE DEVELOPER TO SEND US THE LETTER. DID ANYBODY RECEIVED THE LETTER ALREADY?

  54. riser
    November 17th, 2015 at 14:19 | #54

    Hello fellow buyers. It’s confirmed. Zubicon’s APDL has been approved. I personally called Zubicon to confirm a few minutes ago. We should be able to receive a letter from Zubicon within the next few weeks & possibly sign the S&P in December. This is fantastic news after waiting for so long. Let’s keep each other informed throughout the process.

  55. Kuai ku kia
    November 19th, 2015 at 15:03 | #55

    Could anyone let me know what is zubicon address n tel no? Hv all of u done the balloting so far? My friend is very interested in this project. Tq

  56. Ong
    November 23rd, 2015 at 15:11 | #56

    Anyone start signing S&P already?

  57. yuga
    November 23rd, 2015 at 22:41 | #57

    Hi Friends… I have also got a unit for 200k. Any updates on the signing the S&P.

  58. yuga
    November 23rd, 2015 at 22:46 | #58

    How will be the balloting process….Can we interchange the units after balloting?

  59. LIM
    November 25th, 2015 at 10:16 | #59

    Heard that they are processing the 300K unit first. So, did anybody get the 300k one already received the letter?

  60. LIM
    November 25th, 2015 at 10:19 | #60

    @yuga

    Yuga,

    There is no interchange available after balloting. We have to take whatever we get

  61. yuga
    November 30th, 2015 at 18:22 | #61

    Lim,

    Heard from the guys that signing the S&P for 300k tomorrow onwards. They can change the units by mutual understanding by both parties.

  62. blaaa
    December 4th, 2015 at 11:58 | #62

    Hi Guys, any groupchat created for this project ?
    Line? whatsapp?

  63. kalish
    December 4th, 2015 at 23:26 | #63

    Blaaa,

    Drop your contact number here..

  64. LIM
    December 7th, 2015 at 10:52 | #64

    Yeah, already received the letter of informing sign SnP. Did who else also received?

  65. miao
    December 7th, 2015 at 16:11 | #65

    @LIM
    Not yet, is it for the 200k unit?

  66. Blaaa
    December 8th, 2015 at 01:29 | #66

    kalish :
    Blaaa,
    Drop your contact number here..

    0124105639
    Add me tkss

  67. LIM
    December 8th, 2015 at 09:28 | #67

    @miao

    Miao, yes. For 200K unit

  68. Ong
    December 8th, 2015 at 09:45 | #68

    @ LIM
    When the S&P is signing? Did it cover the stamp duty?

  69. CHOON
    December 8th, 2015 at 14:40 | #69

    Ballating & signing of S&P for 200K started from today

  70. riser
    December 9th, 2015 at 09:03 | #70

    @CHOON
    Balloting has already begun? I am one of the 200k buyers but have yet to receive any letter from Zubicon. May I know how the balloting is done? Do they go batch by batch? Meaning some will receive letter earlier & some later? Thanks!

  71. LIM
    December 10th, 2015 at 13:58 | #71

    Hi, did anybody that 200K already done the ballot? Can share out which floor that you get?

  72. LIM
    December 10th, 2015 at 14:06 | #72

    @riser
    @Riser,

    The ballot period started from 08/12/2015 – 22/12/2015. You are not received yet the letter maybe you are fall under batch 2

  73. Interested buyer
    December 11th, 2015 at 20:47 | #73

    Any unit available for 300 or 400k?

  74. anna
    anna
    December 14th, 2015 at 03:58 | #74

    Hye neighbors,
    New here!!
    Waiting for s&p…

  75. riser
    December 14th, 2015 at 09:36 | #75

    @LIM
    Thanks. Keep us posted on the progress please. I will too when I receive my letter. Have a good day.

  76. LIM
    December 14th, 2015 at 13:26 | #76

    @anna

    Anna, when is your date for ballot?

  77. Ong
    December 15th, 2015 at 16:32 | #77

    Anyone signed the S&P d? How many chance for the ballot?

  78. miao
    December 15th, 2015 at 19:59 | #78

    still yet to receive any letter

  79. Ong
    December 16th, 2015 at 08:18 | #79

    me too…have to wait..i think now is for 200k buyer 1st…300k & 400k should be on mid Jan.

  80. miao
    December 16th, 2015 at 11:09 | #80

    @Ong
    Now is 200k buyer turns though. the developer says send out letters by batch

  81. Anna
    December 19th, 2015 at 23:59 | #81

    Hi lim… i am still waiting for s&p
    Maybe 2nd batch.
    Add me 01136309847
    Hope all get well soon

  82. Ong
    December 21st, 2015 at 07:53 | #82

    got any show room for this project?

  83. jennytan
    December 22nd, 2015 at 09:11 | #83

    I had sign the S&P for 300k. Currently is the turn for 200k. Heard form developer said the S&P for 400k is probably on Jan-Feb.

  84. Yen
    December 23rd, 2015 at 17:36 | #84

    I’m waiting for the letter too…As I’m so worry that whether my loan will withdraw by the bank since the S&P din sign totally. Anyone can advise me??

  85. Sam
    December 23rd, 2015 at 22:14 | #85

    Any group for 400k? 0165444005

  86. Anna
    December 27th, 2015 at 22:53 | #86

    Hi….frens
    Still waiting for snp??
    Anyone knows when get for 200k???
    Any ideas…

  87. Alen Yeoh
    January 4th, 2016 at 23:04 | #87

    I sign S&P and pay downpayment already. and then HL Bank call up and said my letter offer expired already. I need apply again. damn.

  88. Ranee
    January 5th, 2016 at 08:29 | #88

    @Alen Yeoh
    In general practise, developer office will ask purchaser to sign the SnP and loan document together (prefer same lawyer).
    Then you will not fall into the situation you faced, also quite risky if somehow the loan not approve at 2nd attempt (not quite likely, but there is possibility).

  89. @ssok
    January 13th, 2016 at 12:19 | #89

    Pls add me on the Whatapp group as well : 0164836941
    Thank you.

  90. @ssok
    January 13th, 2016 at 12:29 | #90

    The Ballot for low medium cost units has been postponed to March 2016,
    And
    Any ides on the lawyer fees and SNP cost ,
    for 72000.00 low medium cost units

  91. Dan
    January 13th, 2016 at 12:51 | #91

    I also 400k buyer,waiting snp on feb..
    Tat day ask zubicon the lawyer fees is Rm 3k plus .. Anyone know izit including stamp duty?if no around how much?
    Any group for 400k? Add me pls 012 4688955

  92. Ong
    January 13th, 2016 at 15:49 | #92

    I also 400k buyer. Not sure whether snp can be happen in Feb or not. I worry it will drag until March or April. Any group for 400k? Add me 0164962737

  93. sisu
    January 30th, 2016 at 14:21 | #93

    I ve applied for 300K but it is waiting for Bahagian Perumahan approval. In the application, I ve mentioned 300K for all three choices. Is it possible now to change primary choice for 400K ? wht procedure ?

  94. Hajar
    February 4th, 2016 at 17:25 | #94

    Hi.. I just signed the S&P for 200k. but have been told by lawyer & dev to wait about 2-3 months to get back the S&P document after PDC & dev’s sign the document and stamp duty together with my loan agreement. My question is why so long to wait to get back the s&p cause i need it to withdraw my epf. Or the procedure is like that? anyone? #firsttimebuyer

  95. Location
    February 17th, 2016 at 09:11 | #95

    Some 400k buyers will condemn 200k buyers jatuh their standard meanwhile 200k buyer will condemn 72.5k buyer spoit their image.. Macallum is one of the example already, full of ahpig ahdog and hitamputih mixed rainbow colour also got.. This 72.5k started price will consist alot of same standard people like macallum.

  96. blaaa
    February 23rd, 2016 at 13:04 | #96

    Hi, any news of 400k to sign snp & ballot?
    add me in 400k group pls tks
    0124105639

  97. Melvin
    February 25th, 2016 at 11:21 | #97

    So far I heard no news for the 400k, can also add me in the 400k group if there is one out there. thx. 0178915677

  98. Dan
    February 26th, 2016 at 23:18 | #98

    Just confirm with Zubicon , now is LMC turn to sign snp.. So 400k is end of mac or april d

  99. ahbeng
    March 2nd, 2016 at 15:53 | #99

    Anyone create the group chat for 400k purchaser?

  100. Luck
    March 2nd, 2016 at 18:00 | #100

    How much is the rental fee at this location.. I plan to rent out after this..

  101. viv
    March 11th, 2016 at 16:46 | #101

    Anyone with 400k unit that has group chat ?can please add me in?thks

  102. Karonn
    March 17th, 2016 at 15:14 | #102

    The Rise developer office located at where. Please send me an address of it.

    I’m interested of the project.

    Thank you.

  103. no rent out
    March 19th, 2016 at 10:58 | #103

    @Luck

    no rent out for state affordable house , if found out we will report to YB Jagdeep Singh, Penang State EXCO for Housing and Town & Country Planning。

  104. Public unit
    March 19th, 2016 at 11:40 | #104

    @Luck
    Affordable unit is meant for own stay.

    @no rent out
    If open for public unit, can rent out or not?

  105. lim
    April 12th, 2016 at 11:45 | #105

    is any 400k buyer has signed the SNP?

  106. Lim
    April 14th, 2016 at 15:39 | #106

    Has anyone signed the S&P for 400k?
    Does anyone know whether this project is entitle for the “MyDeposit , Bantuan RM 30,000 atau 10% bagi memiliki rumah” Scheme?

  107. Ong
    April 15th, 2016 at 22:33 | #107

    Did anyone taking Maybank housing loan? Is it Maybank housing loan is better compare with other bank?
    Anyone know which bank housing loan package is the best? I wana get some opinion from you guys

  108. EZ Ng
    April 17th, 2016 at 16:51 | #108

    Still available?if yes, pls PM.
    Thanks^_^

  109. lim
    April 17th, 2016 at 21:35 | #109

    I havent sign the SNP for 400k, we need to go through balloting first before we sign. Zubicon asked to apply loan first then only they will let us know when to go for balloting. They said balloting and signing SNP will be done on the same day, so need to prepare cheque if they ask to go for balloting.

    So far I’m applying PB & Maybank house loan, PB revert me within 3-4 working days, but Maybank take longer time to know the loan status. So far, still waiting Maybank to compare their offer with PB.

  110. Newuser
    April 18th, 2016 at 20:21 | #110

    Anyone who bought 400k for 1000 sqft?SNP ready to sign?how many car park for this project?

  111. Ong
    April 27th, 2016 at 16:39 | #111

    Many ppl signed snp d? how is the balloting session there?

  112. onwer
    April 29th, 2016 at 14:17 | #112

    Anyone wanted to join the 400k group chat, please leave your contact here. Thank

  113. 1
    April 29th, 2016 at 15:36 | #113

    anyone already apply for housing loan? so far pbb quotation is 4.45-4.5

  114. Ong
    May 5th, 2016 at 08:03 | #114

    Anyone that is 400k buyer and would like to join whatapps group chat, please leave your hp# here and we will invite you in the chat.

  115. Gan
    May 20th, 2016 at 09:45 | #115

    Hi, if there is any WhatsApp group for 300k and 400k, may invite me, 016 – 4260 452

  116. Juju
    May 21st, 2016 at 07:36 | #116

    012-5573989 @onwer

  117. anna
    May 21st, 2016 at 16:17 | #117

    How long is the S&P will be processed. It is already 5 months?? still pending

  118. Ong
    May 24th, 2016 at 12:09 | #118

    @owner. 0164962737

  119. shan
    June 9th, 2016 at 15:43 | #119

    i do not understand why it takes so long for the s&p be proccesed? yes its aleardy 5 months and still no response from the developer.

  120. Hajar
    June 13th, 2016 at 10:35 | #120

    I called to developer last week, they told PDC signing the document already. probably will get by this week, may be by batch cause a lot of documents. I got called to the lawyer & PDC before to ask & push them about this. Hope what dev told me is correct and can get the snp soon.

  121. Sherlock
    June 27th, 2016 at 11:01 | #121

    So, anyone got the s&p yet? what’s up with the delays

    At least they are building it

  122. Joshon
    July 2nd, 2016 at 22:55 | #122

    Hello ,still have any available for700-800sq.ft. Please pm Thx

  123. kc
    July 3rd, 2016 at 10:17 | #123

    @onwer
    012-4228411

  124. Catherine
    July 16th, 2016 at 12:08 | #124

    016-3285258 @onwer

  125. milan
    July 28th, 2016 at 10:32 | #125

    @owner
    Pls add 0195999777
    TQ

  126. Zack
    July 28th, 2016 at 10:56 | #126

    0164275623 @onwer

  127. Ian
    July 29th, 2016 at 10:09 | #127

    @onwer
    Please add 012-905 8789, Thank you.

  128. Tokong
    August 1st, 2016 at 08:33 | #128

    any whatsapp group for 200k buyers ?

  129. Chang
    August 13th, 2016 at 05:02 | #129

    Who want to sell 200k?

  130. Siti
    August 30th, 2016 at 23:34 | #130

    Sign the s&p june 2016 for 200k unit
    Got a phone call from the lawyer firm to collect the s&p and pay 3k for documentation.
    How about you guys?

  131. Sherlock
    August 31st, 2016 at 18:46 | #131

    @Siti
    Collected as well. 200k

  132. Lim
    September 6th, 2016 at 15:41 | #132

    Hah… still need to pay the lawyer when collect S&P?
    Even I have paid the legal fees when sign S&P and Loan Agreement still have to pay the lawyer again when collect S&P?

  133. john
    November 10th, 2016 at 09:26 | #133

    IS THIS DEVELOPER STABLE?

  134. john
    November 10th, 2016 at 09:34 | #134

    HOW IS THEIR SALES? IF SALES IS NOT GOOD, WOULD THEY STOP THE PROJECT, OR WORSE ABANDON?

  135. Messi
    November 10th, 2016 at 11:56 | #135

    This developer is a newbie on the block> very unstable

  136. sangkari
    January 25th, 2017 at 09:47 | #136

    when this project will complete

  137. Christine
    February 6th, 2017 at 21:03 | #137

    Hi, may i know still have available units for 800sqft $200K?

  138. Teh meng lee
    February 23rd, 2017 at 14:28 | #138

    How can i buy this ? Pls email to me

  139. Yogeswary A/P Marimuthu
    March 21st, 2017 at 15:17 | #139

    How to buy this house??

  140. MOHD ELIAS OTHUMAN
    May 19th, 2017 at 17:41 | #140

    Hi guys,
    anyone created 200k unit Group and moderating it as i wanna be in just got the offer…

  141. JL
    May 24th, 2017 at 08:51 | #141

    r u interested to buy car park, i wanna sell mine. thx

  142. Zack
    May 24th, 2017 at 10:12 | #142

    @JL
    Hi, which block of parking lot that you want to sell?

  143. JL
    June 8th, 2017 at 14:31 | #143

    @Zack
    i have LMC unit,

  144. Ken
    June 14th, 2017 at 15:13 | #144

    Hi all, I’m first time home buyer and if there’s any of you who wishes to sell LMC unit, kindly contact me. Thanks.
    kennardkhoo@gmail.com

  145. Yeoh han siang
    August 2nd, 2017 at 05:14 | #145

    Can.Tell me where your office.. I interesting…. pls send the location for me… call me 60105630732…

  146. Shamini Sally
    August 4th, 2017 at 12:36 | #146

    is there any unit valuable

  147. MABEL KHOR
    September 10th, 2017 at 14:37 | #147

    i would intresting about 1000sf,pls pm me all detail pls and thanks

  148. AndyT
    September 11th, 2017 at 12:30 | #148

    HI

    @kalish

    Add me @ 016-7743858

  149. sky
    September 19th, 2017 at 18:29 | #149

    Any watapps group for LMC unit, please add +60164055054

  150. Razor
    October 28th, 2017 at 03:25 | #150

    @JL
    Hi JL, would like to buy your car park. Kindly pm me your price and unit level at razorazeen@gmail.com. Will contact you as soon I receive the details. Thanks!

  151. Lambo
    February 17th, 2018 at 15:57 | #151

    Please add me 016-455 4425 @owner

  152. loh jiun dar
    February 21st, 2018 at 20:47 | #152

    pm for more detail… thanks

  153. ooi chin wen
    May 20th, 2018 at 21:06 | #153

    kindly pm for details

  154. arwen
    May 20th, 2018 at 21:09 | #154

    ooi chin wen :
    kindly pm for details

  155. Ho Hung
    November 3rd, 2018 at 20:22 | #155

    Pls PM me more details

  156. Ivy
    November 12th, 2018 at 17:10 | #156

    Hi, I’m new here any idea when is the completion date for The Rise 2?

  157. Lim Cheng Kwong
    November 17th, 2018 at 20:54 | #157

    Hi,
    Sp Chelliah project most likely to be delayed. Will the developer pay Penalty ?

  158. Unhappy
    December 10th, 2018 at 14:52 | #158

    Many of the staffs at developer office rude and unprofessional, completely hopeless. Lim, if developer project delay we should definitely proceed with some action, because this developer been totally rigid and inflexible when it come to payments, no reason to let them off if they mess up their end of the bargain.

  159. Solid
    December 23rd, 2018 at 08:47 | #159

    Can we rent out our unit or make it as Homestay for RM 200k unit ?

  160. Aurorakoay
    January 5th, 2019 at 16:58 | #160

    @Unhappy
    Strongly agree!!!! unprofessional at all….

  161. HH
    January 8th, 2019 at 16:30 | #161

    Any unit want to sell? for 200k or 300k unit, pls PM me for more details.

  162. Zam
    February 3rd, 2019 at 04:09 | #162

    Any available unit of 200k or 300k unit, do email me. zmxpro@gmail.com

  163. vincent
    February 18th, 2019 at 17:55 | #163

    any 1000sft buyer here?

  164. Mei
    March 18th, 2019 at 21:41 | #164

    Still available?

  165. Shiang
    March 25th, 2019 at 12:50 | #165

    This project will be delayed?

  166. hajar
    March 25th, 2019 at 16:15 | #166

    @Shiang
    Called to the developer, The Rise Collection II will be completed by June 2019. So, just wait & see the progress on June.

  167. sun sun
    March 30th, 2019 at 14:08 | #167

    ad me pls for RM200k unit. 0122233928

  168. Ivy
    May 3rd, 2019 at 16:43 | #168

    I was told when I called the office in Pg that the hand over keys will be in Aug/Sept 2019

  169. Andy
    May 31st, 2019 at 23:49 | #169

    Hi any owner discussions group created for project?

  170. Yvonne
    June 4th, 2019 at 14:05 | #170

    I heard this project will be delay till November. It is true ?
    Not suppose to done on June ?
    Any owner group for The rise collection II ?

  171. aNDyO
    June 10th, 2019 at 13:20 | #171

    May I know still available to purchase 200k-300k unit? +60164112516

  172. hajar
    June 14th, 2019 at 12:04 | #172

    Hi, just get the info from developer, the VP will be getting by end of this month. Need to pay some fees (maintenance fees (4months advance), fire insurance, cukai tanah & access card) to collect the keys.

  173. evelyn
    June 21st, 2019 at 08:17 | #173

    Hi, supposed 20/06/2019 we may get the key.. But last night i went to the site, see the progress like not very soon… Is it we can get compensation? Any group of 200K, please add me and mine husband in.. We are the owner too… Thanks.

  174. evelyn
    June 21st, 2019 at 08:19 | #174

    @Ivy

    Ivy :
    I was told when I called the office in Pg that the hand over keys will be in Aug/Sept 2019

    Hi Ivy, which office that you called? Zubicon? I called yesterday being told that end of this June.

  175. SK
    June 26th, 2019 at 23:34 | #175

    S&P suppose is 20 June 2019. Until now didn’t received any instructions from developer. Actually what is the status now? Please advise.

  176. Yvonne
    July 4th, 2019 at 10:22 | #176

    @evelyn
    Hi , now already July, had you called again to developer ?
    Any updates?

  177. SK
    July 4th, 2019 at 21:28 | #177

    Zubicon also not sure, when can completed together with OC. All must depend on side and contractors.

  178. evelyn
    July 8th, 2019 at 13:41 | #178

    Hi, did anybody called again Zubicon? Any updates?

  179. evelyn
    July 18th, 2019 at 11:39 | #179

    Hi, did anybody called again Zubicon? Any updates? Its seem like will pending us long time again.. i called to office, the marketing people attitude like entertain me. no manners..

  180. hajar
    July 24th, 2019 at 12:09 | #180

    I’ve called zubicon again now final inspection to get CCC. The contractor also doing some clearing work at the site. According to the marketing people, they will send the VP procession letter soon. She also updated my current address to send the letter later. According to her, after we get the VP letter, must check with the bank or developer first if the bank already fully disburse to the developer. Hope to get the letter soon.

  181. evelyn
    July 29th, 2019 at 15:12 | #181

    Hi, anybody called up Zubicon? Any updates? According to newspaper this month end.. but seems like no any news.

  182. Yvonne
    August 6th, 2019 at 16:43 | #182

    Its August. Don’t know when can able to get house-key?

  183. ayden
    August 18th, 2019 at 12:06 | #183

    Hi. I would like to sell my car park. anyone interested?
    Can email me baiti_depiika@yahoo.com

  184. evelyn
    August 23rd, 2019 at 10:58 | #184

    Hi, did anybody follow up?

  185. hajar
    August 27th, 2019 at 15:48 | #185

    Hi, Just received VP letter from the developer. Need to wait for the bank to release all the loan first to the developer before proceed to take the keys. Before collecting ur key call developer first, if the bank fully release the loan or not. See u all soon neighbours.

  186. evelyn
    August 28th, 2019 at 14:08 | #186

    @hajar
    @Hajar, hi , did you call bank? What did bank said? I have called up bank and being told to wait for their call, they do it batch by batch.. So i want to know is it we get the same answer?

  187. David
    August 28th, 2019 at 15:38 | #187

    Hi I not understand we need to pay rm 140 for lift access card and rm 100 for car park access card.
    Understand we should get it free for first time
    We received VP letter backdated to 1/8-19 whereby letter just received on 27/8/19.so the LAD claim should stop on 1/8/19 or 27/8/19?

  188. evelyn
    August 28th, 2019 at 16:02 | #188

    @David
    Hi David, thanks for the sharing. If like this, we need to call Lawyer to get confirmation. Let together to check with our lawyers. Lawyer being appointed and we have pay them so they should help us to solve it.

  189. David
    August 28th, 2019 at 16:07 | #189

    Yes Evelyn thank for response,we should group together and I have try clarify with Developer ,
    I highlighted every developer give free but they answer just said no ,we won’t give free

  190. evelyn
    August 29th, 2019 at 08:45 | #190

    @David
    Hi David, maybe the fees they took as deposit? And will refund? i don’t know la just i guess. But now i more concern about the LAD claim. Please try to call lawyers and verify. Did anyone already go to collect key today? Can share the experience.. Me and my husband plan to go next week.

  191. hajar
    August 29th, 2019 at 16:42 | #191

    evelyn :
    @hajar
    @Hajar, hi , did you call bank? What did bank said? I have called up bank and being told to wait for their call, they do it batch by batch.. So i want to know is it we get the same answer?

    @evelyn
    hi evelyn, the developer sent the letter same time with the VP letter. yes. the letter is outdated 1/8/19. we just received it on 27/8. I guess the bank already get the letter from developer & now processing for the payment. The payment will take about 1 week. so, can try to call back to developer next week to ask if the loan fully release or not. then u can go & collect the key.

  192. hajar
    August 29th, 2019 at 16:44 | #192

    @David
    which developer give free? usually the tenant need to pay for the lift & parking access card.

  193. David
    August 29th, 2019 at 17:32 | #193

    Tri pinnacle Tanjung Tokong given free to house owner .Yes the tenant need to pay to owner but that is deposit.

  194. evelyn
    August 30th, 2019 at 11:57 | #194

    Hi, i already collected the key. According to the security, Oct only allow for start reno. Only i feel that our monthly maintenance fees very expensive. RM175 per month.. Just LMC, but charge like 800K house value type..

  195. David
    August 30th, 2019 at 12:09 | #195

    Congratulation Evelyn, so the buyer allow to access the building and did they mention about the LAD claim?

  196. evelyn
    August 30th, 2019 at 13:22 | #196

    @David
    Hi David, thanks. ;-) . Yes access to site as Zubicon PIC advisable because need to register with Security. We got asked about the LAD but its seem they dont want to answer. Said management no announcement yet. Never mind, this we can apply through online. We complaint to the related department.

    • Yeoh
      September 1st, 2019 at 10:59 | #197

      Hi Evelyn,

      How you take the key ? Need to prepare any document?Thanks

    • CYZ
      September 14th, 2019 at 22:40 | #198

      Hi @Evelyn I’m one of the owner for 200k, if there’s group chat, would you let me know please. Thanks

  197. David
    August 30th, 2019 at 13:31 | #199

    Noted Evelyn thank we keep in touch here if got any outcome.Do u view your unit?Any comment?

  198. Yeoh
    September 1st, 2019 at 11:00 | #200

    hi Evelyn ,

    Need any document to collect the key ?

  199. Ven
    September 2nd, 2019 at 22:10 | #201

    Im interest to rent a shop lot. How to apply?

  200. evelyn
    September 3rd, 2019 at 12:53 | #202

    @Yeoh
    Hi Yeoh, just follow the requirement from the VP letter. Its stated clearly there..

Comment pages
  1. No trackbacks yet.
(You can also Login/Register to submit your comment using unique ID)

COMMENT GUIDELINES

  • Respectful Conduct: All comments must be respectful. Abusive, offensive, misleading or inappropriate language will be removed.
  • Relevance: Political or off-topic comments may be removed.
  • No Spam or Self-Promotion: Comments that are promotional or appear to be spam will be removed. Please refrain from sharing links or contact information in the comment.
  • Moderation: We reserve the right to review, edit, or delete any comments that violate these guidelines.
  • All advertisement in the comment will be removed. Please contact us for advertising opportunities.



To advertise your property in this page under "Related Properties for Sale/Rent":
 1. Submit your property at PenangPropertySale.com, it's FREE!
 2. Remember to select "The Rise (Chelliah Park City)" as the [Related Project]
 (Please do not advertise your property in the comment)