fbpx

Prominence

Prominence, a mixed development by Bionic Development in Bukit Mertajam, Penang. It is strategically located with easy access to Penang Bridge via Jalan Baru and mere minutes drive to AEON Seberang Prai City mall in Bandar Perda.

This development comprises 24 units of 3-storey shop-offices, 19 units of 2-storey shop-lots and 412 condominium units with condo facilities.

Property Project : Prominence
Location : Bukit Mertajam, Penang
Property Type : Mixed Development
Tenure : Freehold
Built-up Area: approx. 1,000 sq.ft. onwards
Total Units : 412
Indicative Price: RM 300,000 onwards
Developer : Bionic Development Sdn. Bhd.

Location Map:

Tags:
RELATED PROPERTIES FOR SALE/RENT AT
  1. VincentTeng
    VincentTeng
    April 23rd, 2014 at 10:52 | #1

    Hi just wan to check out something with you guys, i have pay 5k for booking fees, now they call me to sign the s&p , they ask me to ready 5% of my unit price for them.(the unit have 5% discount). Now the development say the 5k i pay, is not for the 5 % deposit. I am no understand and confused with the 5k i pay for what ?? Someone know what happened on it????

  2. Johnson
    April 23rd, 2014 at 12:07 | #2

    Ya, the 5k booking fee is not include as 5% deposit, they did inform before that.
    Just a number game, that mean not really discount 5%, is only 3.5-4% only…

  3. super man
    April 23rd, 2014 at 22:15 | #3

    Ya. But v still earn la. Price is going up. Go ahead, don’t think too much.

  4. batman
    April 24th, 2014 at 10:46 | #4

    @super man
    any idea what the selling price is for now roughly? 10-20%?

  5. Coolman
    April 24th, 2014 at 11:04 | #5

    I heard the salesman said the SnP is stamped, will delivery soon to the 1st Batch buyer who signed the SnP. But when i ask the date of stamped, they ignore me. A bit weird

  6. E1
    April 24th, 2014 at 12:07 | #6

    I got HSBC loan approved. but the Bionic lawyer is not HSBC panel lawyer, so got to wait. Anyone face the same issue? thanks.

  7. Coolman
    April 24th, 2014 at 12:10 | #7

    @Coolman
    Anyone face the problem that i had, please share. thanks

  8. agogo
    April 24th, 2014 at 14:32 | #8

    @E1

    Does that mean u did not get to sign the S&P? Did the lawyer tell u that?

  9. batman
    April 25th, 2014 at 09:13 | #9

    @E1
    I got the same problem as you, but i already signed the S&P first. They are in progress to get the panel up. Told me soon can sign Loan Agreement, but how soon? i dono…

  10. E1
    April 25th, 2014 at 09:30 | #10

    i haven’t sign S&P. i had add another name recently, maybe that caused the delay.

  11. E1
    April 25th, 2014 at 09:32 | #11

    anyone know what is the latest price range(per sqf) and the promotion package for type A?

  12. Chocolate
    April 25th, 2014 at 14:12 | #12

    More and more condo in mainland for sale now!

  13. Spiderman
    April 26th, 2014 at 15:02 | #13

    Hi,
    So, when is the construction start and expected completion date ?
    Also, is this commercial title like BM City Mall ?

  14. The amazing spiderman
    April 27th, 2014 at 15:04 | #14

    @Spiderman
    THe date of construction start: Unknown
    It is residential title.

  15. batman
    April 29th, 2014 at 16:00 | #15

    @Spiderman
    Construction date expected commence in June as was told. But like always I’m not sure if they will deay again.

  16. agogo
    April 30th, 2014 at 10:45 | #16

    It seems that they have finalised on the turnkey contractor. So, MAYBE, June it is!! (fingers crossed)

  17. The amazing spiderman
    April 30th, 2014 at 22:03 | #17

    @agogo
    Ya, finger crossed

  18. interested
    May 4th, 2014 at 13:55 | #18

    Hi, is it any available unit left?

  19. wc
    May 4th, 2014 at 21:24 | #19

    Any one let go 1500sq,I’m interested with it

  20. island
    island
    May 5th, 2014 at 09:00 | #20

    @interested

    Hi,

    I would like to let go my booking at the original purchase price from the developer.

    1200 sq ft, 30th floor with 2 car park. Pls give me your contact if you are interested.

  21. Chocolate
    May 5th, 2014 at 09:48 | #21

    island :
    @interested
    Hi,
    I would like to let go my booking at the original purchase price from the developer.
    1200 sq ft, 30th floor with 2 car park. Pls give me your contact if you are interested.

    Can i have your email add? Or contact number?

  22. Koid
    May 5th, 2014 at 14:10 | #22

    @island
    Hi Island, I’m interested on your unit. Please email me at koidsh@gmail.com.
    Thank you.

  23. sokohaw
    May 5th, 2014 at 15:23 | #23

    island :
    @interested
    Hi,
    I would like to let go my booking at the original purchase price from the developer.
    1200 sq ft, 30th floor with 2 car park. Pls give me your contact if you are interested.

    Are u guys for real? Believe what he said? He can just cancel his booking with the developer and get his 5k back, why publish here?

  24. lee
    May 5th, 2014 at 19:16 | #24

    Hi guys, you may refer to http://idaman2.kpkt.gov.my:8888/idv5/98_eHome/laporanJualanRumah.cfm?pmju_Kod=13295&proj_Kod_Fasa=1&proj_Nama=PROMINENCE

    for the latest sold out

  25. island
    island
    May 6th, 2014 at 09:15 | #25

    @Koid

    Hi Koid,

    I had emailed you before in Mar, pls check your email.

    thanks

  26. maple
    May 7th, 2014 at 20:52 | #26

    Hi, any one let go 1200sq with 2 car park and is below 30th floor. I’m interested with it. Thanks.

  27. Chocolate
    May 7th, 2014 at 21:46 | #27

    maple :
    Hi, any one let go 1200sq with 2 car park and is below 30th floor. I’m interested with it. Thanks.

    I am curious how u got this info???

    Can we check for others project as well???

  28. Koid
    May 8th, 2014 at 11:05 | #28

    @island
    Hi Island, do u mind email me again as I didn’t receive any email from u. My email is koidsh@gmail.com. Thanks

  29. island
    island
    May 8th, 2014 at 12:22 | #29

    @Koid

    Hi Mr Koid,

    I just resend the email to you. Pls check your mail box.

    thanks

  30. TAN
    May 9th, 2014 at 17:23 | #30

    @island
    Hi island, please send me to my email tansinyang@yahoo.com.hk , im interest the unit

  31. GF
    May 11th, 2014 at 21:40 | #31

    how can

    @island sold his unit before he get the OC????

  32. Alston
    May 12th, 2014 at 00:09 | #32

    @lee

    May I know this statistic is as at when ? Worrying ppl lol.

  33. Feather
    May 12th, 2014 at 16:10 | #33

    HI,island may i know where is your unit location? Which block. Can you mail me for more detail?my email add redfeather.lin@gmail.com.Thanks@island

  34. lee
    May 14th, 2014 at 08:50 | #34

    @Alston
    If you wish to know more, you may visit this gov website.

    http://idaman2.kpkt.gov.my:8888/idv5/98_eHome/maklumatProjek.cfm?pmju_Kod=13295&proj_Kod_Fasa=1

  35. Water melor
    May 14th, 2014 at 12:57 | #35

    Hi, who knows when the construction start? Y take so long didn’t start, what the problem, who knows the reason , tq.

  36. Concern buyer
    May 14th, 2014 at 13:14 | #36

    Water melor :
    Hi, who knows when the construction start? Y take so long didn’t start, what the problem, who knows the reason , tq.

    How to start without money? Condo in mainland very hard to sell. Because cannot sell, developer cannot start building.

  37. wc
    May 14th, 2014 at 22:21 | #37

    June will start

  38. lee
    May 15th, 2014 at 09:01 | #38

    @wc
    Hi wc, can share where the information that you get. Thanks

  39. asd
    asd
    May 15th, 2014 at 16:04 | #39

    The start date has been changed since Apr then May and now June. The same thing happen on the date to sign SnP. The developer should be serious when communicating the start date to buyers.

  40. police
    May 15th, 2014 at 16:17 | #40

    Sales not good, so developer need to postpone the construction works, if not developer should bear the construction costs for the work done.

  41. BM Properties
    May 17th, 2014 at 13:14 | #41

    i heard they drag until July, any latest update from developer? why they keep drag the construction date? what is their purpose? haihz….

  42. JJ
    May 21st, 2014 at 08:59 | #42

    I’m quite dissapointed with this investment because it worry me when the project continue to delay. Also I notice that this project advertisement also not impressive as other projects. Ex: the advertisement board display a long the road is not attractive at all eventhough the signboard is big. The photo is not attractive at all. Also I notice there are canopy beside the show house. The canopy color is old canopy with old white/grey color and the canopy is also old. It should be red colour with clean or new canopy, attractive banner, put up music and other attractive items should look better to attract more buyer if the sales is bad. Also we can invite all the buyers to attend the funtion and from there they will bring their friend or relative who may potential be the buyer as well. Put advertisement on property sale website like mudah.com and so on which i see most of other projects have advertise in property website even they have not launch yet. We should sign the snp last year but drag until this year March and then not sure they stamp the snp since the date will base on the stamp snp. Is this way they try to continue delay the project at our expense? really dissapointed with this project and with this kind of economy situation, it worry me more…

  43. lkoe
    May 21st, 2014 at 09:27 | #43

    JJ :
    I’m quite dissapointed with this investment because it worry me when the project continue to delay. Also I notice that this project advertisement also not impressive as other projects. Ex: the advertisement board display a long the road is not attractive at all eventhough the signboard is big. The photo is not attractive at all. Also I notice there are canopy beside the show house. The canopy color is old canopy with old white/grey color and the canopy is also old. It should be red colour with clean or new canopy, attractive banner, put up music and other attractive items should look better to attract more buyer if the sales is bad. Also we can invite all the buyers to attend the funtion and from there they will bring their friend or relative who may potential be the buyer as well. Put advertisement on property sale website like mudah.com and so on which i see most of other projects have advertise in property website even they have not launch yet. We should sign the snp last year but drag until this year March and then not sure they stamp the snp since the date will base on the stamp snp. Is this way they try to continue delay the project at our expense? really dissapointed with this project and with this kind of economy situation, it worry me more…

    Talk cock la you. So worry, pull out la.

  44. JJ
    May 21st, 2014 at 09:57 | #44

    With your expression and reaction on this comment, I think u must me one of the employee/worker that involve in this project. poor guy !

  45. island
    island
    May 21st, 2014 at 11:24 | #45

    Developer,

    can you pls be more transparent and clarify to the buyer what is actually happening and what is your plan? This is to gain back the confident from the buyer. You have drag for too long….be fair to the buyer and the buyer should know what is the actual status!

  46. batman
    May 21st, 2014 at 11:49 | #46

    @island
    Super like ur comment Island!….yes Developer pls provide us some piece of info. Aside from worrying the buyers, for me, I basically feel im being fooled each time!…if you cant propel your date of construction do not, again i repeat, do not give empty promises!…

  47. Concern buyer
    May 21st, 2014 at 12:22 | #47

    batman :
    @island
    Super like ur comment Island!….yes Developer pls provide us some piece of info. Aside from worrying the buyers, for me, I basically feel im being fooled each time!…if you cant propel your date of construction do not, again i repeat, do not give empty promises!…

    Developer don’t know when the sales will pick up. So how to give you the dates? Please give some space for developer. Developer also feel sad one you know. T_T

  48. island
    island
    May 21st, 2014 at 13:11 | #48

    Concern buyer :

    batman :
    @island
    Super like ur comment Island!….yes Developer pls provide us some piece of info. Aside from worrying the buyers, for me, I basically feel im being fooled each time!…if you cant propel your date of construction do not, again i repeat, do not give empty promises!…

    Developer don’t know when the sales will pick up. So how to give you the dates? Please give some space for developer. Developer also feel sad one you know. T_T

    I tot earlier the developer told that 70-80% units sold? That is not good enough?
    Or is that mean the 80% only book but subsequently did not sign up S&P?
    What would happen to the buyer who sign the S&P but the project been continue drag?
    If the developer is financially strong, their still can start the contruction while waiting for the sales.

  49. wc
    May 21st, 2014 at 13:19 | #49

    I thought was planing problem …
    this company head quarter is metech group associate with ijm

  50. batman
    May 21st, 2014 at 13:44 | #50

    @Concern buyer
    From a few comments I saw from u, u seem to side the developer, U shud change ur name to Concern Developer…not sure if u r a buyer urself, but if u r not a developer then zip ur mouth becuz I post the comment specifically to them.

    What they told me or promised me, i don’t wan to say it here, i don1 tell u anyway. But as buyers, I believe they owe us an answer here.

    Wise ppl talk when they need to talk, for you, you need to talk becuz u have to talk…

  51. Spiderman
    May 21st, 2014 at 14:36 | #51

    batman,
    Concern buyer is not side the developer lah. He is perli-perli, ‘suan siao’ the developer. Read his words again.

  52. Concern buyer
    May 21st, 2014 at 14:52 | #52

    Spiderman :
    batman,
    Concern buyer is not side the developer lah. He is perli-perli, ‘suan siao’ the developer. Read his words again.

    Thanks spidey. I can sense batman really piss off with the developer. T_T

  53. Spiderman
    May 21st, 2014 at 15:09 | #53

    Sharing:
    Last Nov, when i visited the half finished show room, the Availability Chart showed mostly sold, except type A and C on very high floor, 27th and above. Type A is largest, more than 500K and type C, smallest, more than 400K. So, if the chart is real and ‘accurate’, sales is very good, and delay is unreasonable and strange. Something fishy and deserve worry.

  54. Pink
    May 21st, 2014 at 15:25 | #54

    Haha…I think the chart remains the same till now. When I visited early this month, also more or less the same availability chart. When I ask for lower floors, only they show me a list of those loans got rejected. So how accurate is the chart I wonder…

  55. Concern buyer
    May 21st, 2014 at 15:27 | #55

    Pink :
    Haha…I think the chart remains the same till now. When I visited early this month, also more or less the same availability chart. When I ask for lower floors, only they show me a list of those loans got rejected. So how accurate is the chart I wonder…

    Haha, failed sticker game. Sticker game is fun during boom time. Not so fun during downturn because buyer are not really urgent.

  56. lee
    May 21st, 2014 at 16:50 | #56

    Anyone visit their showroom this week/last week, did they construction started?

    From last August till now, almost 9 months. I wonder how they are going to complete at end of 2016.

  57. maple
    May 21st, 2014 at 17:38 | #57

    Are you all are buyers? Did you all sign S&P already?

  58. wc
    May 21st, 2014 at 18:16 | #58

    Sales agent said 2018@lee

  59. lee
    May 21st, 2014 at 18:37 | #59

    @maple
    HI maple, if you are first batch buyers, i believe your SnP should be stamped at april.

    I signed at feb, stamped at april.

  60. Kelvin
    May 21st, 2014 at 19:15 | #60

    I signed my SNP 1 and half month ago. During that time, the lawyer told me that this project is 50% ++ sold, on hand have around 200++ of SNP waiting the buyers to sign.

    Anyways, I really not understand why they keep delay the construction.

  61. Concern buyer
    May 21st, 2014 at 19:31 | #61

    Kelvin :
    I signed my SNP 1 and half month ago. During that time, the lawyer told me that this project is 50% ++ sold, on hand have around 200++ of SNP waiting the buyers to sign.
    Anyways, I really not understand why they keep delay the construction.

    Developer probably need >90% sold to start the project. Else no money to pay for construction and serving loan interest for the land.

  62. lee
    May 21st, 2014 at 19:46 | #62

    hi, i heard my friend said, some banker inform her that this prominence going to share with IJM, i wonder how true is it?

    Anyone have the same info with me?

    Or it just fake info come out from developer.

  63. Chocolate
    May 21st, 2014 at 20:05 | #63

    Yes, they show me the company profile before and IJM is one of the shareholder.

  64. KK
    May 23rd, 2014 at 07:39 | #64

    IJM is a very experience developer in Malaysia. Externer developer should leverage IJM strength to speed up the project development. I think developer should have enough fund to start the project and should not wait until >90% sold then start.

  65. haiz
    May 23rd, 2014 at 08:26 | #65

    Land gt problem like BM city mall? last time I heard land sink at BM city mall so keep delay?

  66. Concern buyer
    May 23rd, 2014 at 08:51 | #66

    KK :
    IJM is a very experience developer in Malaysia. Externer developer should leverage IJM strength to speed up the project development. I think developer should have enough fund to start the project and should not wait until >90% sold then start.

    They just said that it is something to do with IJM. Where is the proof? Never believe developer.

  67. Feather
    May 23rd, 2014 at 15:31 | #67

    Any one got latest new about the construction delay till when only start? It challenges my endurance.

  68. Spiderman
    May 23rd, 2014 at 16:16 | #68

    @Feather

    Not July meh ? I think they slow slow one, ban ban lai.
    Mar 2013 put in this PPT forum, booking open at KWSP n QBM only end-Aug 13. Layout plan also not in brochures.
    Nov 13 only unfurnished show house, Dec or Jan 14 only fully completed show house.
    Feb n Mar 14 only sign SPA. Apr 14 only 1st batch SPA stamped. Construction start July 14 only ? Completion only in 2017 ?
    Used to be The Signature main competitor, to finish built after them, for stay or rent or sale. Now, by the time finish in 2017, already a lot of competitions from so many condo projects in BM area recently launched. Good luck. IJM did not complaint kah ?

  69. lee
    May 23rd, 2014 at 21:50 | #69

    @Spiderman
    like your comment, I think developer owe us a lots of explanation etc why keep delay the construction and everything.

  70. Charles
    May 25th, 2014 at 10:47 | #70

    sorry all, i already made the cancellation for my booking. i really no eyes to see this project, i better use those money go look for a better investment property. Damn it Prominence!!

  71. fujiapple
    May 26th, 2014 at 15:42 | #71

    @charles

    for cancelation, you 100% get back all the booking fee?

  72. cheewei19862002
    cheewei19862002
    May 27th, 2014 at 17:08 | #72

    They keep delay the construction, i was sign my S&P on Feb, that time they said the construction will start end of March , but until now i only able to see a Flat Yellow Land on there and the show office seems like very quiet… If the sales is not good, why don’t they prepare some function to make it HOT? zzz…
    From lawyer info last on Apr is that its sold around 50% and 30% is hold for BUMIPUTERA, thats y they said already sold 80%++…. =.=”’

  73. Concern buyer
    May 27th, 2014 at 17:33 | #73

    cheewei19862002 :
    They keep delay the construction, i was sign my S&P on Feb, that time they said the construction will start end of March , but until now i only able to see a Flat Yellow Land on there and the show office seems like very quiet… If the sales is not good, why don’t they prepare some function to make it HOT? zzz…
    From lawyer info last on Apr is that its sold around 50% and 30% is hold for BUMIPUTERA, thats y they said already sold 80%++…. =.=”’

    Do marketing/function need money. All I know is most developers (except the big one) currently running very low on cash. Furthermore, do function if got buyer then good la. Unfortunately developer nowaday also know market very bad. Do function also cannot get buyer. So better no need to do.

  74. Water melor
    May 29th, 2014 at 00:00 | #74

    Dear all. For sure the contruction will start at July. Believe me. If u really want cancel, go ahead la. For those who signed, if 36 months can’t complete then v can claim them, what to scare ! Better the developer delay it, then I happy to claim.

  75. Water melor
    May 29th, 2014 at 00:11 | #75

    @Kelvin
    Bcos they r not confirmed the main con that time, but now this issue being settled.

  76. lee
    May 29th, 2014 at 00:20 | #76

    @Water melor
    How do you get this info can share?

  77. Can buy or not ?
    May 31st, 2014 at 10:13 | #77

    How do they get developer license n advertising permit if even main contractor is not confirmed or submitted to housing ministry ? What does Idaman KPKT website publish as their main con ? Main architech and other parties needed in construction confirmed ?

  78. E1
    June 6th, 2014 at 22:43 | #78

    Finally HSBC settled. I will sign S&P next Saturday.

  79. super man
    June 8th, 2014 at 13:38 | #79

    @E1
    May I know settled what from HSBC ? TQ.

  80. E1
    June 10th, 2014 at 22:24 | #80

    the lawyer used by bionic not hsbc’s panel lawyer. now they are.

  81. lee
    June 11th, 2014 at 08:59 | #81

    Hi anyone pass by the site, any good news?

  82. jj
    June 11th, 2014 at 17:41 | #82

    nothing yet. not even the pilling material or big stone to check on the land condition. Many new development site which is later advertise than prominence has already started the foundation work like the condo by Jayamas besides sunway project already started the pilling process.

  83. ch
    June 11th, 2014 at 18:15 | #83

    I have one unit 1276 sqft, 10-8, good view(viewing the small golf area) would like to let go. Anyone interested, may email me:kenbch88888888@gmail.com.

  84. GF
    June 12th, 2014 at 14:35 | #84

    ch :I have one unit 1276 sqft, 10-8, good view(viewing the small golf area) would like to let go. Anyone interested, may email me:kenbch88888888@gmail.com.

    have you sign SnP? you can let go without OC obtained?

    jj :nothing yet. not even the pilling material or big stone to check on the land condition. Many new development site which is later advertise than prominence has already started the foundation work like the condo by Jayamas besides sunway project already started the pilling process.

    Goodfields already have main body structure of two towers, but prominence still having empty land only

  85. E1
    June 16th, 2014 at 11:38 | #85

    i signed S&P. The lawyer told me ~80% sold, not sure can believe or not? 😛

  86. GF
    June 16th, 2014 at 16:09 | #86

    the reason why they cant start the project is because still many not yet sold out!

    http://idaman2.kpkt.gov.my:8888/idv5/98_eHome/laporanJualanRumah.cfm?pmju_Kod=13295&proj_Kod_Fasa=1&proj_Nama=PROMINENCE

  87. lee
    June 17th, 2014 at 16:15 | #87

    GF :the reason why they cant start the project is because still many not yet sold out!
    http://idaman2.kpkt.gov.my:8888/idv5/98_eHome/laporanJualanRumah.cfm?pmju_Kod=13295&proj_Kod_Fasa=1&proj_Nama=PROMINENCE

    I just wonder how fast is the gov website updates?

  88. jj
    June 18th, 2014 at 14:59 | #88

    Ai ya, this is really worrying. Only about 10% sold. The sale team really need to work harder to push up the sale so will not impact everybody

  89. dd
    June 18th, 2014 at 15:33 | #89

    I don’t believe the only sale 10% nia. The website is not up to date.

  90. Kelvin
    June 18th, 2014 at 21:54 | #90

    Usually the government website info is not up to date. A lot of other project is obviously almost sold out but the website always show very low take up rate. Could try and check on other project.

    So don’t be so worry.

  91. Spiderman
    June 20th, 2014 at 00:20 | #91

    The idaman2.kpkt.gov.my website is not up to date for all projects.
    Cannot be only 10% nia. However, 80% sold is also unbelievable.

  92. Wody
    June 30th, 2014 at 14:02 | #92

    Anyone with any updates on the progress? Have they start piling or anything?

  93. agogo
    July 1st, 2014 at 14:52 | #93

    didnt see anything moving on the ground last weekend

  94. cheewei19862002
    July 2nd, 2014 at 13:50 | #94

    Get info from the sales person, they said the Main Con is cannot giving them a price for the construction cost due to the GST, so they unable to start build it. But the sales person told me that will start on around August. ZZZ….

  95. cheewei19862002
    July 2nd, 2014 at 13:50 | #95

    Get info from the sales person, they said the Main Con is cannot quote them for the construction cost due to the GST, so they unable to start build it. But the sales person told me that will start on around August. ZZZ….

  96. tomyam
    July 2nd, 2014 at 14:13 | #96

    @cheewei19862002

    lousy reason from the sales person lor…..

  97. Jack
    July 2nd, 2014 at 14:43 | #97

    Anyone unhappy can place ur comments in their FB…:D

    https://www.facebook.com/pages/Prominence-Bukit-Mertajam/212253275607172#!/pages/Prominence-Bukit-Mertajam/212253275607172

  98. Spiderman
    July 2nd, 2014 at 15:38 | #98

    cheewei19862002 :Get info from the sales person, they said the Main Con is cannot quote them for the construction cost due to the GST, so they unable to start build it. But the sales person told me that will start on around August. ZZZ….

    Ha Ha Ha Ha Ha, that is what you should tell the sales person.

  99. lee
    July 2nd, 2014 at 21:17 | #99

    i think national day we can celebrate first year anniversary, and the piling is not yet start. sad only!!!!!

  100. Leeden
    July 3rd, 2014 at 13:08 | #100

    This is very sad only……

  101. agogo
    July 3rd, 2014 at 14:02 | #101

    @cheewei19862002
    that’s what the lawyer told me too when i signed the S&P..

  102. agogo
    July 3rd, 2014 at 14:04 | #102

    @lee
    yeah!!.. 1st year anniversary since booking!!.. lol

  103. Spiderman
    July 3rd, 2014 at 18:11 | #103

    I think come to Merdaka Day holidays, they will do sales promo at QBM like last year to
    re-start and repeat the whole thing kut. Perhaps, anniversary promo, yeah !

    The big big stones to check land condition have to put for 1 to 2 months first before pilling can start. Don’t worry, be happy !

  104. ==
    July 3rd, 2014 at 22:13 | #104

    yup, promotion price, below 11 flr 1500sf, price below 400k with DIBS, free all legal fee and stamp duty, just pay 5k, after 3 years can sell at 600k, 5k change 200k in 3 years, fast go sapu, sapu 5 units will be millionaire in 3 years.

  105. Spiderman
    July 7th, 2014 at 19:26 | #105

    @==

    yes, you r right. The only worry is that if developer abandons it halfway, incompleted, then 5 units also millionaire in 3 years, millionaire in debts lo. LOL.

    ok, serious matter: when start construction ? or still ding dong ding dong …
    Berjaya condo already 5 or 6 floors, my bro win me already, aiyoh.

  106. Apes
    July 22nd, 2014 at 17:18 | #106

    Machinery trucks are moving in. Construction begins…

  107. dd
    July 22nd, 2014 at 17:19 | #107

    Dear all, moving in piling machines today. Good news.

  108. ckc
    July 22nd, 2014 at 23:10 | #108

    Yes, it’s a good news to purchasers, but im still worry and don’t have too much confidence as the developer oledi got “black dot” in my mind…not very trust them…hopefully they will keep the work nonstop…else…we all purchasers will once trick by them again…..

  109. JimmyLoh87
    July 23rd, 2014 at 11:35 | #109

    hey guys, anyone has the current update of Prominence construction progress? I saw their fb page show that they are going to start the construction ady…is that real?

  110. cc123
    July 23rd, 2014 at 11:43 | #110

    @JimmyLoh87
    yup, I oso saw the update info about the construction on their fb page. And I went to the sites to look for it yesterday and I saw many machines and trucks there. It seems like thy really wan to start construction already…Good news to all purchasers! =)

  111. soo
    July 24th, 2014 at 15:11 | #111

    construction start! so glad to see it~

  112. KKTan
    July 24th, 2014 at 20:20 | #112

    Where are those big big stones to test soil hardness before pilling ?

    Why now suddenly, curious whether they moved in trucks and those machines just to impress visitors for the Star Property Fair which they participated. Hope not like that.

  113. Kelvin
    July 24th, 2014 at 23:44 | #113

    Just visited the property fair today. They come out a very attractive package, including come with almost full furnish that equip with fan, 4 air-con , kitchen cabinet , washing machine and….. ready to move in when completed.

    For me, those who really interested in this project, can consider to grab a unit. You will surprise with that they will give you rebate in cash as part of DIBS compensation.

  114. agent
    July 25th, 2014 at 01:01 | #114

    Kelvin :Just visited the property fair today. They come out a very attractive package, including come with almost full furnish that equip with fan, 4 air-con , kitchen cabinet , washing machine and….. ready to move in when completed.
    For me, those who really interested in this project, can consider to grab a unit. You will surprise with that they will give you rebate in cash as part of DIBS compensation.

    how much for cheapest unit?

  115. lee
    July 25th, 2014 at 14:26 | #115

    Can the existing owner purchase the package?

  116. Apes
    July 25th, 2014 at 15:29 | #116

    anyone went to the check the property fair can confirm if the car park for unti below 20th still the same one, or two now?

  117. jj
    July 27th, 2014 at 13:27 | #117

    The new promotion is very attractive. Can developer also offer to those buyer that have purchase the unit earlier as well? Hope they can consider and not only offer for new buyer

  118. ckc
    July 28th, 2014 at 00:56 | #118

    visited the developer in gurney, i saw the selling chart and i saw the marking they put….totally cheated by the G.E Tan sales person. Last year when i visited the fair in qbay,they show me the chart and oledi sold most of the units. But today, i went there and the sales person told me this marking is all new customers booking during this fair. Actually, the selling is around 50% only before this fair.Now, i undstd why the project keep delaying and delaying….the lawyer also told me almost 300++ units oledi sold…all is lying. Now, hopefully the developer really do the construction and not only for show to attract customers to buy at property fair….below 20th,same as 1 cpark.

  119. kelvin
    July 28th, 2014 at 01:38 | #119

    @jj
    Ya, really interested with the latest package that they offer. Thinking whether they allow us to change to this package or not.

  120. kelvin
    July 28th, 2014 at 01:42 | #120

    @ckc

    Is it the new booking a lot? Around how many percent overall? If after this fair, the take up rate is good, then the construction shall be going smoothly.

  121. banana
    July 28th, 2014 at 08:56 | #121

    @ckc

    Do you know why the lawyer also helped developer to lie? Because the”contracted” lawyers are usually given the opportunity to purchase a few units at discounted price. Same for all other projects. The developer’s “associates”, example, architects, lawyers, contractors are all given the chance to choose their units before soft launch. That’s why by the time of soft launch, most “nice” units are all “reserved”.

  122. ckc
    July 28th, 2014 at 21:44 | #122

    has just visited the site today, saw truck and seem like no big2 stone or any materials…may be i dun c…or they put somewhere..

    oh…ic….now i know banana…..
    Kelvin…i oso hope the construction start as what they promise…else…no eye c..

  123. interested
    July 31st, 2014 at 08:59 | #123

    taiwan developer i heard, true? how’s the sales now? good?

  124. thinkeddy
    thinkeddy
    August 1st, 2014 at 02:15 | #124

    @interested
    Yes. Sales good or not i not sure. But i already book 1 unit

  125. miaomiao
    August 1st, 2014 at 08:42 | #125

    The truck is resting there..it seems hibernate there. May be it is used for display to enhance Public’s confidence

  126. police
    August 1st, 2014 at 10:07 | #126

    @miaomiao
    Truck & all machinery rest on site also want to paid rented cost. The developer lost money also if paid for this machinery. Got bagla & Indonesian worker on site or not?

  127. miaomiao
    August 1st, 2014 at 10:09 | #127

    police :
    @miaomiao
    Truck & all machinery rest on site also want to paid rented cost. The developer lost money also if paid for this machinery. Got bagla & Indonesian worker on site or not?

    I think it is worth to rent a truck and 1-2 timber and putting there in order to save for the project. No workers pun…seems very sunyi. U even can play football at the clear land

  128. police
    August 1st, 2014 at 12:05 | #128

    I think sales not so good for this project. Condo project already over supply in Mainland, better don’t buy condo in mainland, you will feel pity & regret for your investment in future unless for own stay.It be worst if the developer run away with your money.

  129. miaomiao
    August 1st, 2014 at 12:24 | #129

    police :
    I think sales not so good for this project. Condo project already over supply in Mainland, better don’t buy condo in mainland, you will feel pity & regret for your investment in future unless for own stay.It be worst if the developer run away with your money.

    Absolutely agree with you!

  130. ckc
    August 2nd, 2014 at 15:35 | #130

    no bangla and indon there, very quite and seem like the truck is moving out…duno why?

  131. bull_shit
    August 2nd, 2014 at 20:40 | #131

    @ckc The rented cost for 24 hours sure very expensive, that’s why the developer allow the truck went back when holiday & maybe will be back on Monday morning to let people see the truck still there.

  132. fujiapple
    August 3rd, 2014 at 23:17 | #132

    who actually can tell what is the status for this project now?
    Feel no confdent to them… Stay or lets go? expert give some opinion..

  133. Steve
    August 5th, 2014 at 13:43 | #133

    @fujiapple
    Noone here is real expert. Real expert won’t come give opinion here. Just make ur own judgement.

  134. kss
    August 14th, 2014 at 15:37 | #134

    who know how much for the extra car park?

  135. damon
    August 18th, 2014 at 16:08 | #135

    anyone went to site, has the piling work started?

  136. Ironman
    August 19th, 2014 at 23:45 | #136

    I went there on Saturday 16/8/14,the office sales consultant say will start construction by tomorrow ,so I went there again on yesterday 18/8/14 still nothing happen ….

  137. agogo
    August 20th, 2014 at 10:40 | #137

    Any idea what’s the sales like after the event at Gurney?

  138. property guy
    August 23rd, 2014 at 14:46 | #138

    which view is nice? scenery or city view?

  139. dd
    August 23rd, 2014 at 15:42 | #139

    Swimming pool view of course la.

  140. soo
    August 25th, 2014 at 15:45 | #140

    i will never never buy through agent again, call them also dunno the detail, end up have to call developer! Very irritating!

  141. cc123
    August 25th, 2014 at 15:50 | #141

    Hey guys, just for survey…anyone bought unit from GE Tan agency before? Why I can’t contact the sales person after I booked the unit since last year. I want to confirm with my SPA but don know who can contact.

  142. Steve988
    August 25th, 2014 at 16:03 | #142

    U may ask the developer sales at the sales gallery. That time when I want to change owner detail also looking for the developer sales to help.

  143. Kelvin
    August 25th, 2014 at 21:48 | #143

    @cc123

    Contact the lawyer our self. I also bought it from G.E TAN, but when checking on the SPA progress, i call the lawyer directly.

  144. steve
    August 27th, 2014 at 23:09 | #144

    anyone want to buy the unit? owner introduce got special package for current and new owner… email me stevanchai@yahoo.com… hehe… win win..

  145. Like it also
    August 28th, 2014 at 23:53 | #145

    Construction already started ?
    This Merdeka got any promo in QBM like last year or not ?
    Heard last year package was attractive.

  146. BigHillLeg
    August 29th, 2014 at 08:58 | #146

    Yes, they have Merdeka Promo in QBM now.
    Same free gifts of electrical stuff and kitchen cabinets.

    Will visit to the site and see if any construction on going now…
    P/S: I’m not a buyer yet, still considering if wanna buy one.

  147. BigHillLeg
    August 30th, 2014 at 13:17 | #147

    Visited the site on Friday 29th August, nothing in progress.
    Visited the QBM fair on the same day, chart showing 70-80% Sold and about 10% on Loan.
    Same, free electrical stuff and kitchen cabinets. 8% Discount on DP and 2% Rebate later on.

  148. Like it also
    August 31st, 2014 at 21:20 | #148

    @BigHillLeg

    Thks. 70-80% sold plus 10% on loan already, but still want to delay construction ? I wonder why. Anyway, Happy 1st annniversary to Prominence, Happy Birthday also.
    So, pay only 2% first and later can get refunded the money as rebate ? If yes, this is cool.

  149. BigHillLeg
    September 1st, 2014 at 10:22 | #149

    Yes, Pay 2% DP and get 2% rebate later on.
    Free all legal fees. this is really good deal….
    But I think they playing the “Sticker Game”….we never know…
    and delaying the construction is really pulling me off this project…
    When I visited their fair at QBM, the sales told me it’s in the progress of piling now….
    obviously the sales has no idea what’s going on at the site as well….

  150. agogo
    September 2nd, 2014 at 09:53 | #150

    gentlemen/ ladies, the 70-80% is a sticker game.. the same game a year ago.. they showed me a bunch of units on the chart (huge number) covered with stickers during the booking.. went to the sales office half a year later and found those units available for booking.. you’ll be surprised the lawyer plays the same game.. he will point at a stack of files and try convince you that soooooo many units have been sold and signed..
    anyway, happy 1st year anniversary to those who booked on the same day i did.. and about the sales people, you might find yourself more equipped with information than them.. but not all of them la.. if you are not happy with the sales person you are talking to, talk to another..

  151. Tresor
    September 2nd, 2014 at 10:58 | #151

    the sales person informed that piling work start on the 1st Sept…is it true?

  152. TL
    September 2nd, 2014 at 17:27 | #152

    If u r confident to developer, then buy, if not don’t talk bull shit.

  153. yy
    September 2nd, 2014 at 23:25 | #153

    i book a unit last year just pay RM500. Can i wait the project really start contruction then only go to sign the SNP??

    For those who alredy sign, what is the package? as promise during the time giving booking fee.

  154. Tresor
    September 3rd, 2014 at 11:53 | #154

    yy..
    the developer did not push for signing SPA?

  155. BigHillLeg
    September 3rd, 2014 at 12:04 | #155

    @yy
    just paid RM500, holding the unit till now???
    no Bank Loan Application at all?

  156. Like it also
    September 3rd, 2014 at 13:06 | #156

    yy,
    They still remember you and your unit or not ? or already sold it to oth during multiple promo.
    Anyway, If they still reserve it for you, then you really “keng” wah, can teach me the trick boh ? thks.

  157. fujiapple
    September 6th, 2014 at 17:33 | #157

    i dont believe able hold until now. If Yes, conclusion is the sales is really bad…
    really 80% sold??

  158. yy
    September 6th, 2014 at 17:45 | #158

    HI guy,
    My booking no longer valid without any prior inform before i post something at here.
    After i post something here, they wake up just inform me thru sms.
    Really sleeping Zzzz,no follow up and bad service developer.

    Just let it go this project, more and more choice condo in mainland which we can trust more.. good luck to all buyer.

  159. steve
    September 7th, 2014 at 15:03 | #159

    haha.. who can trust this yy??

  160. steve
    September 7th, 2014 at 15:04 | #160

    project/developer good or bad only the time will know. let’s see. :)

  161. kelvin
    September 7th, 2014 at 22:23 | #161

    Visit the show room today, feel glad to see that got few buyers there and some have close the deal.

    The sales chart showing more than 80% sold now , a lot of improvement compared to when they have fair at Gurney plaza on July – only have 50% take up rate.

    I think the concept of come with furniture and 2 % cash rebate for DIBS did attract a lot of buyer. Follow the success the story of Signature where is fully sold out now.

    There is 2 trucks working there and deepening the hole.

    Hope it can be progress smoothly as this project have already delay for one years.

  162. Tresor
    September 8th, 2014 at 14:08 | #162

    any site photo to update here?

  163. Charles
    September 8th, 2014 at 17:39 | #163

    woah, since i drop the booking now still got people concerning about the prominence? god damn funny ya. From the information i get it from sales/ agent, they just putting the truck there and delaying the time since they told me this developer having serious internal issues but i have really no idea what is happening.
    i’ll never regret to drop since i already place the booking to another project, anyway, good luck again to all Prominence buyer. Cheerssss

  164. william
    September 8th, 2014 at 17:45 | #164

    hello every one… how is the project now???? may i know…

  165. william
    September 8th, 2014 at 17:47 | #165

    charles what you mean internal issues??? can enlightening me on it??? sales agent mean the developer staff or out side appointed agent???

  166. william
    September 8th, 2014 at 17:49 | #166

    harles what you mean internal issues??? can enlightening me on it??? sales agent mean the developer staff or out side appointed agent???@Charles

  167. Charles
    September 9th, 2014 at 13:56 | #167

    @william
    i dont know whether she is from developer side or agent, but i did get the info from them. For the possibility to trust have to be confirm la they said then i just listen lor, how i know is it true or not since i already throw away Prominence. Aiya believe it or not based on your trust to developer la, she might a liar or maybe have such thing really happened in developer. who knows 😀

  168. dd
    September 9th, 2014 at 23:42 | #168

    Finally the construction start………

  169. heyo
    September 10th, 2014 at 14:50 | #169

    hey dd, u went check out? start piling or still test piling?The last i know is test piling only..no real work ongoing tat time.

  170. PP
    September 11th, 2014 at 13:31 | #170

    May i know if i pay booking fee n after sign snp n pay bank interest, in this pay interest period and developer bankrap n counstruction stop, thenk my loan bank will take what action to me?

  171. Chocolate
    September 11th, 2014 at 13:42 | #171

    PP :
    May i know if i pay booking fee n after sign snp n pay bank interest, in this pay interest period and developer bankrap n counstruction stop, thenk my loan bank will take what action to me?

    U think this can be implement?

  172. Chocolate
    September 11th, 2014 at 13:43 | #172

    Chocolate :

    PP :
    May i know if i pay booking fee n after sign snp n pay bank interest, in this pay interest period and developer bankrap n counstruction stop, thenk my loan bank will take what action to me?

    U think this can be implement?

    Sorry wrong reply..lol..

  173. Spiderman
    September 11th, 2014 at 14:02 | #173

    PP :May i know if i pay booking fee n after sign snp n pay bank interest, in this pay interest period and developer bankrap n counstruction stop, thenk my loan bank will take what action to me?

    @PP

    fr what i know is if you had signed SnP, loan agreement, Charge and stamped and currently servicing the loan interest, financially, you are the bank debtor, owe the bank. You have to continue paying and settle the loan disbursed, if not, the bank will send legal letter to you to claim back all their money and cost incurred. The bank won’t care about your incompleted condo because they cannot auction (lelong) it to recover the money. Rains or shines, they gain lah.

  174. Charles
    September 11th, 2014 at 15:09 | #174

    Spiderman :

    PP :May i know if i pay booking fee n after sign snp n pay bank interest, in this pay interest period and developer bankrap n counstruction stop, thenk my loan bank will take what action to me?

    @PP
    fr what i know is if you had signed SnP, loan agreement, Charge and stamped and currently servicing the loan interest, financially, you are the bank debtor, owe the bank. You have to continue paying and settle the loan disbursed, if not, the bank will send legal letter to you to claim back all their money and cost incurred. The bank won’t care about your incompleted condo because they cannot auction (lelong) it to recover the money. Rains or shines, they gain lah.

    give you 100 likes 😀

  175. BM Kid
    September 13th, 2014 at 19:41 | #175

    Anyone really really know construction started already or merely digging, digging, testing, testing only ?
    So, until July, 9 mths time only sell 50% and suddenly in Aug, 1 mth sell another 30% to make it 80% ? This is super good marketing.

  176. fujiapple
    September 13th, 2014 at 23:40 | #176

    Really worry on this project… like empty promise alway..

  177. kiong
    September 14th, 2014 at 00:51 | #177

    No progress at all! Not pilling…but a few paip besi thr!

  178. Charles
    September 14th, 2014 at 16:51 | #178

    my friend, one of the victim buyer, tell me september will start the construction( info from sales ),what is the purpose for dragging? i just wondering…text pile need took so long time? any one can answer this question? i just help my fren, i ask him drop it but he still struggling.

  179. fujiapple
    September 14th, 2014 at 22:30 | #179

    Charles :
    my friend, one of the victim buyer, tell me september will start the construction( info from sales ),what is the purpose for dragging? i just wondering…text pile need took so long time? any one can answer this question? i just help my fren, i ask him drop it but he still struggling.

    Actually no body know what happening inside… nothing in progress…

  180. Kevin
    September 15th, 2014 at 14:25 | #180

    about 10 workers are working on the site today.

  181. fujiapple
    September 16th, 2014 at 08:34 | #181

    who know the target completion this project is Yr 2016 or Yr 2017???
    lasted boucher mention 2016.

  182. Tay
    September 16th, 2014 at 09:49 | #182

    Who is the buyer here?
    ANy updates?

  183. Charles
    September 16th, 2014 at 11:37 | #183

    @Kevin
    Kevin can share some photo to any social media page? or post to their fb page, their fb never update anything, im wondering is it already start pilling….

  184. dd
    September 16th, 2014 at 14:46 | #184

    Today is Public Holiday, any worker working there?

  185. Chocolate
    September 16th, 2014 at 16:06 | #185

    I went to 4 construction sites today and the workers are working, so this is nothing to do with public holiday or not.

  186. Charles
    September 17th, 2014 at 16:17 | #186

    @Chocolate
    oh yeah, glad to heard that, hope everything are goes fine 😀

  187. Chocolate
    September 18th, 2014 at 16:05 | #187

    Left not much units available to pick. No more semi furnished promotion package offer to public.

    Still in test pill stage.

  188. fujiapple
    September 18th, 2014 at 21:06 | #188

    why test so long de…. they build anti- earth quake building as taiwan???

  189. Chocolate
    September 18th, 2014 at 21:22 | #189

    Hahaha..normally take one year la. But snp signed half year ago, so actually left 24 months for theM to complete the project before kena LAD.

    Anyway the Taiwanese salesgirl Yumi is very nice!

  190. fujiapple
    September 18th, 2014 at 21:54 | #190

    @Chocolate
    that means 2016 want to complete ar? can on time bo??? then who sign SNP early may have “extra bonus” when they really late loh…

  191. coconut
    September 19th, 2014 at 09:52 | #191

    @Chocolate
    Do u got Yumi number? Haha. I went there many times also not meet Yumi .

  192. Chocolate
    September 19th, 2014 at 09:59 | #192

    coconut :
    @Chocolate
    Do u got Yumi number? Haha. I went there many times also not meet Yumi .

    U look like coconut she didn’t want to entertain u la..hahah..

  193. Spiderman
    September 19th, 2014 at 10:36 | #193

    I want, I want also. Can you give me Yumi number ? Must visit there also.
    I need to replace Gwen Stacy with her lah.

  194. Spiderman
    September 19th, 2014 at 10:39 | #194

    BM Kid :Anyone really really know construction started already or merely digging, digging, testing, testing only ?So, until July, 9 mths time only sell 50% and suddenly in Aug, 1 mth sell another 30% to make it 80% ? This is super good marketing.

    Is the Aug sales shoot up due to the Taiwanese salesgirl Yumi very nice ? Now, I know why liow…

  195. mo
    September 21st, 2014 at 12:10 | #195

    i think they just digging, digging, testing, testing only as what BM kid say.i went ther this fri and oly few(i think 5oly) are doin work ther, seem like just walking around ther oly…

  196. heyo
    September 22nd, 2014 at 17:11 | #196

    anyone here applied loan frm HSBC? I signed the loan agreement months back but till now the lawyer haven’t get stamped and give me a copy yet. Anyone face this too?

  197. Tay
    September 22nd, 2014 at 23:16 | #197

    Any updates

  198. dd
    September 24th, 2014 at 19:52 | #198

    Got working.

  199. kevin
    September 25th, 2014 at 14:26 | #199

    Getting more workers and trucks inside the site. At least see some hope.

  200. Spiderman
    September 25th, 2014 at 16:25 | #200

    The good news is that I saw that big big square stones for checking land condition before pilling is already there. Getting closer to pilling day.

Comment pages
1 2 3 4 5 6 7 7618
  1. No trackbacks yet.
(You can also Login/Register to submit your comment using unique ID)

COMMENT GUIDELINES

  • Respectful Conduct: All comments must be respectful. Abusive, offensive, misleading or inappropriate language will be removed.
  • Relevance: Political or off-topic comments may be removed.
  • No Spam or Self-Promotion: Comments that are promotional or appear to be spam will be removed. Please refrain from sharing links or contact information in the comment.
  • Moderation: We reserve the right to review, edit, or delete any comments that violate these guidelines.
  • All advertisement in the comment will be removed. Please contact us for advertising opportunities.



To advertise your property in this page under "Related Properties for Sale/Rent":
 1. Submit your property at PenangPropertySale.com, it's FREE!
 2. Remember to select "Prominence" as the [Related Project]
 (Please do not advertise your property in the comment)